Waiting on

Copy links for sign-offs and vendors

Send a one-click link from your own email, so only the right person gets it.

ForAgents coordinating vendor work or outside sign-off

Before you startHave the intended recipient’s address and verify the link’s request.

  1. Open the request. For a sign-off, choose "Get sign-off link" on the item. For a vendor, choose "Nudge" with the vendor's name.
  2. RequestOps makes the link and shows it with a short message. Choose "Copy message" or "Copy links", then paste it into your email or chat.
  3. Or choose "Email it" to open your own email with the message filled in.
  4. Anyone who has the link can use it, so send it only to the person who should answer.
  5. If you prefer, post the links in a comment that everyone on the request can see.
  6. A checklist can have several outside sign-offs, one per item. Sending a new link for an item stops the old link for that item.

What you should see

The recipient receives a link for the intended action without exposing it in a public comment.

If something is not right

Copy did not reach the clipboard. Select and copy the shown link, then paste it into your email. Check the recipient before sending.

Still stuck? See Troubleshooting, or write to [email protected].