Anyone. Anyone who can see the board. Updated 6 November 2026 · Bunlings 2.3.0

Where estimates save (and who can save)

Know where Agree writes, who can save, and how to ask a teammate who can. For anyone in the room, about 3 minutes to read.

3 minutes · anyone in the room

Steps

12
  1. See where it goes

    After the reveal, a line next to the result names the field, for example “Saves to Story Points”. That is your board’s own estimate field. Bunlings reads it from the board’s setup, so nobody has to choose it.

12
  1. Agree saves, as you

    Press “Agree · 5”. The number goes into the work item at once, written as you, so Jira’s History shows your name. You have 10 seconds to undo. Each save is a normal Jira edit, so Jira’s usual notices may go to watchers.

  2. Can’t save? Ask someone who can

    To save, you need permission to edit work items in that space. If you don’t have it, the room says who can, for example “You can’t change estimates here. Ana Popescu and 2 others can save it.” Press “Ask Ana Popescu, Sam Carter, and Cleo Martin to save”.

3
  1. They save it in the room

    Your teammate sees a line in the room, for example “Alex asked you to save 5.”, with two buttons: “Save 5” and “Not now”.

  2. Save to another field

    To save to a different number field, open the room menu (•••), then “Room options”, then “Estimating”. Pick it under “Save estimates to”. It applies from the next round. Jira’s sprint totals still count the board’s own field.

  3. Add a step after saving

    Under “After saving” in the same tab, the room can add a label, move the work item to a status or add it to a sprint. Each happens once the estimate has stood for 10 seconds. Leave them empty to change nothing else.

  4. Find saved estimates in Jira

    Once an estimate has stood for 10 seconds, a hidden marker on the work item records what was agreed, how far apart the votes were, and when. It doesn’t show on the work item, but Jira search can use it. Paste one of the searches below into Jira’s work item search.

  • Work items the team agreed at 5

    erAgreed = 5
  • Items where the team split

    Votes two or more cards apart.

    erSpread >= 2
  • Agreed since a date

    Change the date to the one you want.

    erAgreedAt >= "2026-11-01"
  • Retro actions still open

    erAction = open

If something’s off

  • You see “Couldn’t save. You can’t edit this work item in Jira. A space admin can give you Edit permission.”

    Ask a teammate who can edit to save it, with “Ask … to save”. For the long run, a space admin can give you Edit permission.

  • You see “Couldn’t save. Story Points isn’t on the edit screen for Story in this space. A space admin can add it.”

    Jira only takes the field if it is on the work item type’s edit screen. A space admin can add it. The message has a link to the right place.

  • You see “Changed in Jira to 8 since you voted.”

    Someone changed the estimate in Jira during the round. Choose “Keep 8” to leave it, or “Use 5” to save the room’s number.

  • The launcher says “This board doesn’t use estimates yet.”

    You can still vote, but nothing is saved to Jira. A board admin can switch on estimation in Board settings.

Still stuck?

Write to support@unitlane.net. Tell us what you clicked and the exact words you see.

Go to the support page