Anyone. Anyone who can see the board. Updated 6 November 2026 · Bunlings 2.3.0

Vote from phones on the big screen

Show the table on the big screen while everyone votes from their phone. Anyone in the room can set it up, in a minute.

1 minute · anyone in the room

Steps

345
  1. Put the room on the big screen

    Open the room on the computer that drives the meeting room screen.

  2. Open the phone sheet

    Choose the phone button at the top of the room. Its name is “Vote on your phone”.

  3. Scan the code

    Everyone scans the QR code with their phone’s camera and signs in to Jira if it asks. The room opens on the phone, ready to vote.

34
  1. Under “Room link”, choose “Copy” and send the link to anyone who can’t scan.

  2. Vote, and watch the table

    People vote on their phones. The big screen stays as the table: the cards land there and flip together for everyone to see.

5

If something’s off

  • The sheet says “This link is too long for a QR code.”

    Choose “Copy” and open the link on the phone instead.

  • The phone asks to sign in.

    Everyone votes as themselves, so each person signs in to your Jira on the phone once.

Still stuck?

Write to support@unitlane.net. Tell us what you clicked and the exact words you see.

Go to the support page