Anyone. Anyone who can see the board. Updated 6 November 2026 · Bunlings 2.3.0

Run a round

Vote, reveal and agree on one work item, and save the number to Jira. Anyone in the room can do it, in about 3 minutes.

3 minutes · anyone in the room

Steps

12
  1. Pick your card

    Pick a card from your hand. To change your mind, pick another one. To take your vote back, click your card again. With the keyboard, type the number, ? for “Not sure”, or C for “Coffee break”.

1
  1. Wait, or reveal now

    The panel shows how many have voted, for example “4 of 6 voted”, and the table counts what is left, such as “1 to go.” The cards open by themselves when everyone has voted. If you don’t want to wait, press “Reveal now”.

2
  1. Read the cards

    All cards flip together. A short line says how close you are, such as “In sync”, “Nearly agreed · 8” or “Votes differ”. The median and the average sit under the votes. If the votes are far apart, ask the lowest and the highest what they see.

3
  1. Agree on a number

    The Agree button carries the suggested number, here “Agree · 8”. Press it to save that number. When the votes differ, pick the final value in the row of cards first, then press the Agree button with that number. If the room still can’t agree, press “Vote again” or “Set aside” to leave the item for later.

4
  1. Undo if you need to

    A bar says “Saved 8 to ERS-3 · 7 s” and counts down from 10 seconds. Press “Undo” to put back the value Jira had before.

5
  1. On to the next item

    The next work item is already on the table, and the ready count at the top goes up, for example “4 of 10”. Agreed items move to “Done” in the session panel.

If something’s off

  • You see “Your vote didn’t go through. Pick the card again.”

    The room didn’t get your card. Pick it once more.

  • You see “Sam runs the room. Take over to do this yourself.”

    Your room has a lead, and only the lead reveals and moves on. You can still vote and agree. To run it yourself, choose “Take over” in Room options.

  • The bar says “Too late to undo here. Change it in Jira.”

    The 10 seconds have passed. Open the work item in Jira and change the estimate there.

  • The result says “Not saved to Jira: no estimate field. Choose one in Room options.”

    Your board has no estimate field. Open the room menu (•••), then “Room options”, then “Estimating”, and pick a field under “Save estimates to”.

Still stuck?

Write to support@unitlane.net. Tell us what you clicked and the exact words you see.

Go to the support page