How it’s counted: planned, finished, joined later, taken out
Every number in both apps comes from the same few rules, and you can read them. Anyone can open them, in about 5 minutes.
Steps
-
Open the rules
Choose “How it’s counted” in the bar under the header of either app, or in the ••• menu. It lists the rules in plain lines: “Counting”, “Finished”, “Sizes”, “Subtasks”, “The plan”, “History”, “Holidays”, “Left out” and “No estimate”. When your board matches Jira’s defaults, it says “Matches Jira’s way”.
-
Finished
An item counts as finished when it sits in a finished column when the sprint closes. The finished columns are the last column by default, and you can choose them. An item that was reopened before the sprint closed is not finished. An item that was already done when it joined the sprint adds nothing.
-
No estimate
An item with no estimate counts at your team’s usual size, never as 0, and the note says so: “This counts 2 unestimated items as 3 points each.” If one such item decides the answer, the note shows both outcomes. You can pick a fixed size to use for them, or count items instead of points.
-
The usual range
“Usual” is the middle of your last sprints with the highest and the lowest left out, so one freak sprint doesn’t move it. “Sprints used” in “Settings” sets how many. A sprint is left out, and says why, when it has no dates, ran under an hour, had no work, finished nothing, or belongs to another board.
-
The “Worth a look” line
When the app’s number differs from the number Jira likely shows, the “Worth a look” line says so, for example “Jira likely shows 36 for Sprint 46; this count is 34.” Choose “Why” to see each step. An app can’t read Jira’s own report, so this is the number its rules should give.
-
Preview, then save
“What counts” can narrow the board to a quick filter, a component, a label or a team. Change a choice, like the aim “Careful · 7 in 10”, and a bar shows the result first: “With this change: Likely needs about 9 more days.” Choose “Use this” or “Cancel”. After saving, “Undo” appears. “Back to Jira’s way” puts everything back.
If something’s off
-
A number is different from Jira’s report.
Open “Worth a look”, then “Why”. It lists the differences, one per row.
-
An item you expected is missing.
Open “How it’s counted” and look at “Left out”. Each item shows its reason.
-
A sprint isn’t in the usual range.
Its jar says “left out” and why, for example “nothing finished” or “ran in parallel”. Choose “Include anyway” to see the difference.
-
You can’t change a rule.
You see “Only people who can edit work items in this board’s projects can change this.” Ask a Jira admin or the project lead.
Still stuck?
Write to support@unitlane.net. Tell us what you clicked and the exact words you see.