Sprint Forecast: get started

Open your sprint, read one sentence that says whether it fits, and see the proof under it. Anyone who can see the board can do it, in about 2 minutes.

2 minutes · anyone who can see the board

Steps

  1. Open it from the sprint menu

    In Jira, go to your board. Open the ••• menu of a sprint and choose “Will this sprint fit?”. The board’s menu and the backlog’s menu have “Bunlings Sprint Forecast”. You can also open “Bunlings Sprint Forecast” from the Apps menu or from your project’s sidebar. In the Free app the names say “Free”.

  2. Wait a moment, once

    The first time, the app reads your board’s last sprints. A steady line says “Reading your last sprints” and counts up, like “3 of 10”. A normal board takes a few seconds, a big one a minute or two, and you can leave the tab. After that the answer is ready at once and refreshes every hour.

  3. Take the short tour, if you like

    The first time, a “Welcome” strip offers “Show me around”. The tour has three short stops: the answer, the picture, and the tabs. Choose “Skip” to leave it, or “Got it” to close the strip.

  4. Read the answer

    The top line is the answer in plain words, like “Too close to call”, “Likely fits, with 1 to 2 days to spare” or “Likely needs about 3 more days.”

  5. Check the proof

    Under it sits the proof, for example “4 of your last 10 sprints went fast enough to finish all 20 points by Fri, Nov 13. The other 6 needed 1 to 3 more days.” That is the whole forecast: your own past sprints, replayed on the work in this one.

  6. Look at the picture

    The picture, “How your last 10 sprints would have gone with this plan”, shows each past sprint as one little character (a Bunling), standing on the day it would have finished this sprint’s work.

  7. See who finishes in time

    Characters left of the “Sprint ends” line finish in time. The ones on the right, under a label like “6 sprints need more days”, need more. Point at one to see which sprint it is, or click it to see that sprint’s forecast.

  8. Use the tabs for the rest

    The header has four tabs: “This sprint”, “When done”, “Track record” and “Team”. “When done” gives likely dates for epics and releases, “Track record” shows how earlier forecasts held, and “Team” shows each person’s load.

  9. When a tab is missing

    On a board without sprints (Kanban) the first tab is “Now” and there is no “Track record”. If your Jira admin has switched people views off, there is no “Team” tab.

  10. See what is in the plan

    Under the answer, the row “Items in this sprint” opens the list of work items in your board’s order. A line marks where the plan stops being “Very likely” and becomes a “Stretch”. Drag the line up or down to see the odds change. Nothing you try is saved in Jira.

  11. Change how sure you want to be

    The chip “Aim for 8 in 10” is how sure you want to be. Choose it to open “Settings”, then pick “Normal · 6 in 10”, “Careful · 7 in 10”, “It matters · 8 in 10” or “A release depends on it · 9 in 10”. A higher aim asks for more days to spare. Choose “Use this” to save. It is the same for everyone who opens this board.

  12. Share it

    Choose “Copy summary” in the bar under the header. You can copy the answer as text for your team chat (“Copy as text”), as a picture for a slide (“Copy as image”), or as a CSV of the work items (“Download as CSV”). A copy ends with “A forecast, not a promise”, so nobody reads it as one.

  13. Open the ••• menu

    The ••• button at the top right opens a small menu. “Appearance”, “Look” and “Motion” are only for you and change nothing for your team. “Look” is “Bunlings” or “Plain dots, no characters”. Below them are “Settings”, “How it’s counted”, “See a sample team”, “Help and guides” and “More from Bunlings”.

If something’s off

  • You see “This board has no open or planned sprint yet.”

    Create a sprint in the backlog, then come back.

  • You see “Not enough finished work yet.”

    The forecast needs finished sprints to learn from. It starts once 3 sprints have finished. Until then it shows what it has and says it is rough.

  • You see “This board doesn’t use sprints.”

    Kanban boards have no sprint to fit. Epics and releases still get likely dates, on the “Now” tab and on “When done”. See the guide “Epic and release forecast”.

  • You see “You can’t see this board’s work items, so there’s nothing to show.”

    Jira doesn’t let you browse that board’s project. A project admin can add you.

Still stuck?

Write to support@unitlane.net. Tell us what you clicked and the exact words you see.