Evidence groups
Preserve the detected references, blockers, and coverage notes for later review when cleanup needs approval, audit follow-through, or admin handoff.
Use the review workspace to see what evidence exists, what needs attention, and which limitations must remain visible before handoff.
The review step separates available Jira and JSM evidence from missing or outside-scope records so the pack does not overstate what was proven.
Preserve the detected references, blockers, and coverage notes for later review when cleanup needs approval, audit follow-through, or admin handoff.
This point keeps the evaluation practical: what to inspect, why it matters, and what should remain a manual review before any Jira cleanup decision.
This point keeps the evaluation practical: what to inspect, why it matters, and what should remain a manual review before any Jira cleanup decision.
It does not hide unavailable historical group membership or convert missing proof into a clean result.
This point keeps the evaluation practical: what to inspect, why it matters, and what should remain a manual review before any Jira cleanup decision.
This point keeps the evaluation practical: what to inspect, why it matters, and what should remain a manual review before any Jira cleanup decision.
This point keeps the evaluation practical: what to inspect, why it matters, and what should remain a manual review before any Jira cleanup decision.
Continue to Request Evidence Control for JSM for the current screenshots, evaluation path, trust boundaries, and Marketplace trial link behind this workflow.